Built by Experts

The TurboCell team leveraged decades of hands-on experience managing extreme loads across the data center, distributed power, and automotive sectors to create a power architecture for the AI era.
Hand interacting with a tablet displaying a detailed bar graph and data analytics.
2019
Endeavour identifies the need for a new power system to address grid volatility and growing interconnect delays.
The team envisions data centers evolving into frequency-control nodes on the grid—unlocking generation capacity and accelerating renewable integration. Endeavour funds the development of a patented, high-efficiency Brayton-cycle power system built around mass-produced automotive turbochargers. This fast-response generator handles aggressive load transients and block loading, while outperforming CARB emissions standards without aftertreatment.
Optional CTA
Industrial mechanical equipment comprising metallic pipes, filters, and cylindrical components mounted on a black frame.
Endeavour funds development of breakthrough rapid-response generator
2020
Endeavour’s engineering team begins adapting the technology for data center use, exposing the system to a comprehensive set of grid instability mechanisms.
They conclude that to optimize the performance and reliability of on-site generation assets for irregular frequency control a fundamentally new architecture is needed—close coupling generation to a battery in a unified hybrid system.
Optional CTA
2021
Endeavour sets out to deliver a hybrid power system built on advanced, mass-manufactured technologies and selects BorgWarner to prepare its power system for mass production.
The partnership fuses Endeavour’s pioneering vision and systems engineering with BorgWarner’s decades of mastery in turbocharger development, scaled manufacturing, and global supply chains, creating a foundation to bring next-generation power systems to market at multi-gigawatt scale.
Optional CTA
Endeavour partners with BorgWarner to scale generator production with autograde manufacturing and global supply chains​
2023
As large-scale AI training clusters grow in Endeavour’s data centers, the team observes that synchronous, high-frequency power transients are stressing legacy systems.
The hybrid DC architecture they pioneered for irregular frequency control can be further optimized to address this AI power challenge. By upgrading the battery system to absorb millisecond- and sub-millisecond-level transients and closely coupling the TurboCell system to the server racks, they create a solution that eliminates transients and harmonics at the source.
Optional CTA
Endeavour leverages their hybrid battery architecture to harmonize AI power loads for maximum reliability​
2024
BorgWarner delivers the first commercial TurboCell units, which are placed in application-specific test cells for extensive acceptance testing, design optimization, and large-scale validation ahead of initial field deployment.​
Optional CTA
Two workers in a factory inspecting large industrial machinery units mounted on wooden pallets under yellow overhead cranes.
First commercial TurboCell units placed in field for extensive real-world testing​
2025
Endeavour announces the TurboCell brand and begins pilot testing production units in conjunction with AI cloud and hardware providers, using simulated training load profiles and real-world data center operating conditions.
The hybrid DC architecture delivers unmatched power quality and performance, even under the most demanding loads. The system is verified to provide 99.999% availability, thanks to its design, minimal moving parts, and small failure zone.
Optional CTA
Two construction workers wearing helmets and reflective vests walking between large industrial equipment units outdoors under clear blue sky.
Pilot testing and production with AI cloud and hardware propviders, achieving 99.999% reliability even under demanding loads
2026
TurboCell manufacturing achieves automotive-level throughput in state-of-the-art, modular facilities optimized for high-volume, scalable output, and consistent quality across every unit.
Optional CTA

Delivering capacity at automotive scale in 2027, available exclusively through Edged Infrastructure.

Contact us
Two rows of large white industrial electrical cabinets facing each other along a gravel path under a partly cloudy sky.